Lend Lease engaged Manly Concrete to do ground and suspended slabs, concrete columns ,shear walls ,stairs, curved auditorium walls, in Situ walls and retaining walls. A total of 11,446m² of concrete slab on ground was poured, along with a further 11,038m² of suspended slab. This project received two awards in 2017 from Master Concreters; the Best Project over $20M Award and the Wagner’s Supreme Award which is awarded to the best project over all 5 categories.