For the new Woolworths project, overseen by Mainbrace, Manly Concrete were asked to carry out works involving the tying of Reo, pouring of concrete slabs, columns and stairs, and the placement of formwork across three levels, including a basement and mezzanine level. In total, 9591m² of slab on ground and 6890m² of suspended slab was poured. The main podium slab of 4100m² was poured as one slab. Refer to the video of the works showing the size of the project and coordination required to deliver a project to the strict quality requirements demanded by the Client.